Which is not true according to the video?
A: Sprint Planning should be decided by the product owner and the team.
B: The whole team needs to discuss problems they found at the period of sprint review.
C: The workflow of Sprint is Product Backlog, Sprint Planning, Sprint Backlog, Sprint, Potentially Shippable Product and Retrospective.
D: The Scrum Master is a servant-leader for the Scrum Team.
A: Sprint Planning should be decided by the product owner and the team.
B: The whole team needs to discuss problems they found at the period of sprint review.
C: The workflow of Sprint is Product Backlog, Sprint Planning, Sprint Backlog, Sprint, Potentially Shippable Product and Retrospective.
D: The Scrum Master is a servant-leader for the Scrum Team.
A
举一反三
- 关于Scrum的每一次冲刺(Sprint),下面的()是正确的
- 在Scrum中,整个开发过程由若干个迭代周期组成,一个迭代周期称为一个Sprint,每个Sprint的建议长度是一至四个月
- 关于Scrum的每一次冲刺(Sprint),下面的()是正确的。 A: Sprint是一个不超过4周的迭代,其长度一旦确定,将保持不变 B: Sprint的产出是一个可用的、潜在可发布的产品增量 C: Sprint在进行过程中,其开发目标、质量验收标准和团队组成不能发生变化 D: 以上所有选项
- 10. 关于Scrum的每一次冲刺(Sprint),下面的( )是正确的。 A: Sprint是一个不超过4周的迭代,其长度一旦确定,将保持不变。 B: Sprint的产出是一个可用的、潜在可发布的产品增量。 C: Sprint在进行过程中,其开发目标、质量验收标准和团队组成不能发生变化。 D: 以上所有选项
- 在第一个sprint中团队做什么?() A: 为后续sprint制定计划 B: 预先决定完整的架构和基础设施 C: 交付设计文档 D: 完成sprint目标
内容
- 0
关于Sprint,以下说法错误的是( )。 A: Sprint长度在开发过程中是可以调整的。 B: Sprint长度的设定取决于能保障多长时间需求变化不影响到产品开发。 C: 需求在一个Sprint中原则上应保持不变。 D: Sprint以迭代计划开始,以迭代回顾结束。
- 1
敏捷团队已经开完Sprint计划会议,目前正处于一个为期两周的Sprint会议的第六天。团队应该集中精力做什么?() A: 仅完成他们各自的任务 B: 与Scrum大师讨论上报问题 C: 规划详细的结构和设计方案 D: 随着Sprint的进展,资源完成任务
- 2
在处理一个sprint的用户故事时,团队成员提出了调整组织过程实现价值交付最大化的想法。向团队提出这个想法的最佳时机是什么?() A: 在下一次sprint规划会议上 B: 在下一次每日scrum期间 C: 在项目状态会 D: 在sprint回顾会上
- 3
在第一个sprint中团队做什么() A: A交付设计文档 B: B预先决定完整的架构和基础设施 C: C完成Sprint目标 D: D为后续的Sprint制定计划
- 4
敏捷项目团队决定采用使用中的测试过程,这一决定在哪一次会议上产生的?() A: sprint回顾会议。 B: sprint审查会议。 C: 发布回顾会议。 D: sprint计划会议。