• 2022-06-06
    Project X has the following cash flows: C0 = +2,000, C1 = -1,150, and C2 = -1,150. If the IRR of the project is 9.85 percent and if the cost of capital is 12.00 percent, you would
    A: accept the project.
    B: reject the project.
    C: do not know.
    D: need further information.
  • 举一反三