A: cell cycle
B: life cycle
C: energy cycle
D: regeneration
cycle
举一反三
- cell cycle specific agents:
- which one of the followings did not win Nobel Prize ? A: Programmed cell death B: Regulation of cell cycle C: telomere and telomerase D: RNA interference E: cell necrosis
- Which of the following best defines a cell cycle? () A: The process from the beginning of a mitosis to the beginning of the<br/>next one B: The process from the beginning of a mitosis to the end of the next<br/>one C: The process from the end of a mitosis to the end of the next one D: The process from the end of a mitosis to the beginning of the next<br/>one
- During which phase of the cell cycle would a cell go into a quiescent state? A: G0 B: G1 C: G2 D: S
- Which of the following statements is right? A: RB exerts anti-proliferative effects by controlling the G1-to-S transition of the cell cycle B: RB is a key positive regulator of the cell cycle C: The TP53 was the first tumor suppressor gene to be discovered by the study of retinoblastoma D: Malignant transformation is only derived from one of the normal RB alleles inactivated
内容
- 0
Which<br/>of the following cell cycle descriptions is CORRECT? () A: DNA are replicated during the G2 phase. B: Interphase is when the cell spends most of its time performing its<br/>cell functions. C: The interphase consists of prophase, metaphase, anaphase, and<br/>telophase. D: Cell prepare itself for mitosis during S phase
- 1
Which of the following is correct about pro-oncogene? A: It is a normal cellular gene B: They are normally involved in the control of the cell cycle C: When mutated or inappropriately expressed,can cause a cell to become malignant D: All of the above
- 2
For the following cycles, which belong to power cycles ( ) A: Reheat Cycle B: Regenerate Cycle C: Rankine Cycle D: Refrigeration Cycle
- 3
生命周期评价的英文为 A: Live cycle assessment B: Life circle assessment C: Life cycle assessment D: Life cycle assessing
- 4
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is(). A: development B: concept C: system analysis D: implementation