    The first phase of a project is the feasibility study. According to the PMBOK, which of the project management process group does the feasibility study phase need
    A: Plannin
    B: Planning and monitoring & controllin
    C: Initiating and closin
    D: All of five process groups: initiating, planning, executing, monitoring & controlling, and closin
  • D

    内容

    • 0

      Time management is the allocation of time in a project's life cycle through the process of: A: Planning B: Estimating. C: Scheduling. D: Controlling E: All of the above.

    • 1

      It is a responsibility of ________ to control the process for writing a feasibility study report. A: the project manager B: the software engineer C: the development manager D: system analyst

    • 2

      Project Initiation is the first phase in the project management life cycle .

    • 3

      The document that officially sanctions the project is the ( )。 A: Project charter B: Feasibility study C: Project plan D: Benefit/Cost analysis

    • 4

      (Single choice)(2 points)Regarding the budget preparation, what is done during the feasibility study phase is ( ) A: Construction drawing budget B: Project settlement C: Investment estimate D: Design estimates