• 2022-06-03
    The main production links of the open-pit production process include ( ).
    A: Ore and rock preparation
    B: Mining and loading
    C: Transportation
    D: Breaking
  • A,B,C

    内容

    • 0

      Which of the two cleaning process controls are included by Cleaner Production?() A: control before production B: control after production C: the whole process of production D: the whole process of product cycle

    • 1

      ________ is a type of technology that centers on large-batch production and requires moderate levels of complexity and sophistication. A: Unit production B: Mass production C: Process production D: Service production

    • 2

      Demand-driven (market-driven) innovation process models include ( ) A: Market demand B: R&D C: Production D: Sales

    • 3

      SAP divides production into multiple processes such as production planning, manufacturing execution and production for process industries.

    • 4

      The main limitation of films is A: Instability B: Production with dust flying C: Inapplicability for many administration routes D: Low drug loading capacity