• 2022-06-10
    Which of the following are mine construction procedures ?( )
    A: Mine pre-feasibility study
    B: Mine feasibility study
    C: Preliminary mine design
    D: Mine construction design
  • A,B,C,D

    内容

    • 0

      This is _____ book. The book is _____. This is _____ apple. The apple is _____. A: my, mine, her, her B: my, mine, hers, her C: mine, my, hers, her D: my, mine, her, hers

    • 1

      Her answer is considered not acceptable, and _________. A: neither am I B: mine is neither C: neither is mine D: either is mine

    • 2

      When preparing a feasibility study for a new construction project, the first point is likely to be___________ A: the cost and availibility of the land B: the fees for the building design C: the construction cost D: the marketing cost

    • 3

      Mine type refers to the type of mine which is divided according to the designed annual production capacity of the mine.

    • 4

      Her answer is not acceptable, and______ A: neither am I B: either is mine C: C. neither is mine D. mine is neither